Pacifico Energy Korea signed MOUs with three major supply chain companies (EEW KHPC, KMC Shipping, CS Energy) to develop the 3.2GW Jindo offshore wind cluster in Gwangyang Bay, Jeollanam-do. The partn
Korea Western Power, Vuna Energy, and Copenhagen Infrastructure Partners (CIP) signed a joint development agreement for the 500MW Taean offshore wind project targeting 2030 completion. The project wil
Chungcheongnam-do province has been selected to construct a specialized testing center for large offshore wind turbine components in Dangjin's Seokmun National Industrial Complex, with total investmen
Korea's offshore-wind capacity is ready — but the grid can't deliver it. Grid bottlenecks are the binding constraint. Where the grid fails and how to break the deadlock.
Korea's Offshore Wind Special Act (effective 26 March 2026) turns the market into a government-led planned-siting regime. What the Act, Decree and Rules actually change.
Korea has designated 10 offshore-wind cluster zones totalling 14.4 GW — 57.7% of its 2035 target. A comprehensive status report on every zone: capacity, lead and stage.
Korea's 2026 H1 offshore-wind auction cut fixed-bottom to ₩171.229/kWh and priced floating separately at ₩175.100 — the first decoupling. Full results and what it means.
Shell, BP, Equinor, RWE and Macquarie have exited or stalled in Korea's offshore wind — a structural verdict, not a coincidence. Why the global majors are leaving.
Korea pledged a ₩250/kWh offshore-wind LCOE by 2030 and ₩150 by 2035 — while cutting its auction ceiling almost every year. Industrial policy, or political declaration?
Korea Southern Power (KOSPO) announced full-scale development of 2.2GW in major offshore wind projects, welcoming the government's medium-to-long-term offshore wind bidding roadmap (2026–2035). The co
Gunsan City's public-led offshore wind farm development project received a 'success' evaluation from the Korea Energy Agency. The 1.02 GW project near Eocheongdo is designated as an integrated offshor
South Korea's six state-owned power generators held a forum to discuss offshore wind project acceleration, proposing joint procurement of turbines, shared port infrastructure, and improved project eco