Korea offshore wind โ€” active pipeline. As of 2026-09.

Korea's active offshore wind pipeline stands at 113 projects totalling 37.7 GW. Of these, 108 hold a generation licence, 14 are in the environmental assessment process with 24 completed, 17 projects have won a fixed price contract since 2022, and 8 are already in operation.

113
Active projects
37.7GW
Pipeline capacity
108
EBL licensed
14
In EIA process
24 completed
5.1GW
Auction-awarded
17 projects since 2022
8
In operation

Recent Regulatory Activity

Electricity Regulatory Committee decisions & government filings · updated daily
327th Electricity Regulatory Committee · Aug 14, 2026 · 1 offshore-wind item
Approved
Dadaepo Offshore Wind · EBL share acquisition
326th Electricity Regulatory Committee · Jul 10, 2026 · 5 offshore-wind items
Approved
Imja Offshore Wind · EBL amendment
Approved
Sinan Blue Imja Offshore Wind · EBL amendment
Approved
Sinan Blue Bi-Geumtu 2 Offshore Wind · EBL amendment
Approved
Sinan Blue Jaeun Offshore Wind · EBL amendment
Approved
Sinan Blue Sinui Offshore Wind · EBL amendment

Project filings

Latest government & project filings
2026-08-31
Jeollanam-do Sinan Offshore Wind Cluster โ€” power grid coordination body member change request
Jeonnam Sinan (POSCO-KOEN) ยท By Yeonggwang, Jeonnam
2026-08-31
Yeonggwang Yaksu Offshore Wind ESS facility โ€” provisional REC price review for H2 2026
Yeonggwang-Yaksu ยท By Korea Midland Power (KOMIPO)
2026-08-31
Public-waters occupation & use licence application โ€” stakeholder consultation reply (Taean Offshore Wind Farm construction project)
Taean ยท By Ministry of Oceans & Fisheries (MOF)
2026-08-31
EBL permit review request for Incheon Eco Wind Offshore (pre-EBL)
By Korea Airports Corporation (KAC)
2026-08-31
EBL permit review opinion reply for Incheon Eco Wind Offshore (pre-EBL)
By Ministry of Oceans & Fisheries (MOF)
2026-08-31
EBL permit review request for Incheon Ara Offshore Wind (pre-EBL)
By Korea Airports Corporation (KAC)
2026-08-31
EBL permit review opinion reply for Incheon Ara Offshore Wind (pre-EBL)
By Ministry of Oceans & Fisheries (MOF)
2026-08-31
EBL permit review opinion reply for Incheon IC1 Offshore Wind (pre-EBL)
By Korea Energy Agency (KEA)
2026-08-28
Public waters occupancy and use permit (PWOP) modification notice [Permit No. 2026-47, Sinan Daekwang Offshore Wind]
Sinan-Daekwang ยท By Sinan, Jeonnam
2026-08-28
Draft EIA review opinion reply [Yeonggwang Chilhae Offshore Wind Power Project]
ChilHae 1 ยท By National Institute of Ecology
2026-08-28
Opinion reply regarding petition receipt related to Jindo Myeongnyang Offshore Wind Power Project
Jindo Maeryang ยท By Jindo, Jeonnam
2026-08-28
Marine use consultation reply [Wando Geumil Offshore Wind โ€” geotechnical survey for detailed design]
Wando Geumil ยท By Ministry of Oceans & Fisheries (MOF)
2026-08-28
Wando Geumil Offshore Wind phases 1 & 2 transmission electrical equipment change-of-use contract execution proposal acceptance notification
Wando Geumil ยท By Korea South-East Power (KOEN)
2026-08-28
Environmental conservation plan (2nd round) review opinion notice [Anma Offshore Wind Power Project]
Yeonggwang Anma Offshore Wind (Consolidated) ยท By Ministry of Climate, Energy & Environment
2026-08-28
Incheon EcoWind Offshore Wind Power Project โ€” licence deliberation opinion inquiry
Incheon Eco Wind Offshore (pre-EBL)
2026-08-28
Incheon Ara Offshore Wind Power Project โ€” licence deliberation opinion inquiry
Incheon Ara Offshore Wind (pre-EBL)
2026-08-28
Licence deliberation review opinion reply for offshore wind power generation project (Incheon Public-Led Offshore Wind IC1 Power Generation Project)
Incheon IC1 Offshore Wind (pre-EBL) ยท By Ministry of Climate, Energy & Environment
2026-08-27
Southwest Offshore Wind Demonstration Complex Power Plant and 3 Others โ€” Grid Connection Offer Review Results Notification
Southwest Offshore Wind Phase 2 ยท By KEPCO
2026-08-27
Sinan Offshore Wind (300MW) Jeollanam-do โ€” licence and basic design service change contract (4th) execution notification and post-contract management delegation
Jeonnam Sinan (POSCO-KOEN) ยท By Korea South-East Power (KOEN)
2026-08-27
Sinan Offshore Wind (300MW) licence and basic design service contract amendment (4th) execution
Jeonnam Sinan (POSCO-KOEN) ยท By Korea South-East Power (KOEN)

Shared grid infrastructure

Common connection assets serving multiple projects

These transmission assets are built once and shared. Their schedule constrains the commercial operation date of every project connecting through them — so they are tracked separately, not under any single project.

345kV Southwest Offshore Wind Shared Grid Connection
KEPCO · Buan-gun / Jeongeup-si · 23 filings
Serving: Jeonbuk Southwest Offshore Wind Expansion Complex 1
2026-08-14
Basic plan establishment notice (Southwest Region Offshore Wind Shared Grid Connection Facility โ€” Jeongeup section)
2026-08-14
Basic plan establishment notice (Southwest Region Offshore Wind Shared Grid Connection Facility โ€” Buan section)
2026-08-14
Obstruction survey cooperation request (345kV Southwest Region Offshore Wind Shared Grid Connection Facility construction project)
2026-08-14
Obstruction survey result reply (345kV Southwest Region Offshore Wind Shared Grid Connection Facility construction project)
2026-08-14
345kV Southwest Region Offshore Wind Joint Connection Facility Construction Project transmission line candidate route obstruction inquiry related law review opinion reply
2026-08-13
Alternative Committee 4th meeting implementation (345kV Southwest Region Offshore Wind Shared Grid Connection Facility construction project)
2026-08-13
National heritage preservation impact review result reply to obstruction survey cooperation request (345kV Southwest Region Offshore Wind Shared Grid Connection Facility construction project)
2026-08-13
Project stakeholder consultation implementation (345kV Southwest Region Offshore Wind Shared Grid Connection Facility construction project)
345kV Sinan Offshore Wind Shared Grid Connection
KEPCO · Sinan-gun · 16 filings
Serving: Jeonnam POSCO-KOEN, Sinan Blue Imja
2026-08-04
Project Management Cost Disbursement (345kV Sinan #1 Offshore Wind Joint Connection Facility Construction Project)
2026-07-29
Sinan Offshore Wind joint main feeder line and connection point stakeholder meeting implementation
2026-07-28
345kV Sinan #1 Offshore Wind Joint Connection Facility Construction Project site selection committee 7th meeting implementation
2026-07-23
Sinan Offshore Wind and Joint Connection Facility Stakeholder Meeting Implementation
2026-07-22
Project Management Cost Disbursement (345kV Sinan #1 Offshore Wind Joint Connection Facility Construction Project)
2026-07-22
Project Management Cost Disbursement (345kV Sinan #1 Offshore Wind Joint Connection Facility Construction Project)
2026-07-13
345kV Sinan Offshore Wind Joint Connection Facility transmission line construction project related meeting
2026-07-07
Project Management Cost Disbursement (345kV Sinan #1 Offshore Wind Joint Connection Facility Construction Project)
Shared Grid Connection โ€” Policy & Contracting
KEPCO · 2 filings
2026-07-31
Offshore Wind Shared Grid Connection Facility Contract Processing Method Establishment Report
2026-07-31
Offshore Wind Shared Grid Connection Facility Contract Processing Method Notice

Capacity by region

Gigawatts, active pipeline

ProvinceGW
Jeonnam22.97
Ulsan3.71
Incheon3.49
Chungnam3.23
Jeonbuk1.59
Gyeongnam1.09
Busan0.65
Gyeongbuk0.50
Jeju0.28
Gyeonggi0.20
Total pipeline37.7

EBL site locations

Licensed site locations ยท interactive map coming to Premium

Korea offshore wind licensed site locations
108 EBL sitesInteractive map โ€” Premium, coming soon

Foundation type split

Gigawatts by technology

37.7GW total
Fixed-bottom32.6086.5%
Floating5.1013.5%

Auction outlook

Gigawatts awarded and expected, by year

1.793.750.101.220.830.695.532.272.812022202320242025202620272028
Awarded
Expected / pending

Developers & gencos

Lead developers

Gigawatts led ยท private ownership ยท fixed vs floating

CIP3.53 ยท 7
KREDO2.51 ยท 7
Ocean Winds2.25 ยท 5
Hanwha1.98 ยท 5
Northland Power1.83 ยท 5
ร˜rsted1.47 ยท 2
MyungwoonยทB.Grimm1.15 ยท 2
SK ecoplant1.13 ยท 3
Hyundai E&C0.92 ยท 3
Vena Energy0.89 ยท 2
Fixed-bottom Floating

Province-designated cluster zones: 0.35 GW across 1 sites (developer not yet assigned).

Genco equity participation

Gigawatts held via equity stake ยท a project may span several gencos

KOMIPO3.33 ยท 10
KOEN3.04 ยท 7
KOSPO2.98 ยท 10
KOWEPO2.83 ยท 8
KHNP1.33 ยท 2
EWP1.11 ยท 3
KEPCO0.64 ยท 4

Gencos take minority equity rather than 100% ownership, so figures overlap with the developer projects on the left; combined genco pipeline โ‰ˆ 14 GW.

Active pipeline only โ€” merged/duplicate records and withdrawn/returned/failed projects excluded.

Developer capacity attributed to lead developer, not equity-weighted.

EEZ projects folded into their coastal province.

๐Ÿ”’
Coming soon
This section is being prepared for
premium members.