Project Data Hub

Korea offshore wind active pipeline: 124 projects totalling 40.2 GW as of July 2026. Six projects in operation, nineteen auction-awarded, thirty-nine in EIA process and one hundred and four holding a generation licence.

Project Data Hub

Korea offshore wind โ€” active pipeline

As of 2026-07
123
Active projects
40.8GW
Pipeline capacity
108
EBL licensed
14
In EIA process
22 completed
5.1GW
Auction-awarded
18 projects since 2022
6
In operation

Pipeline progression

Projects at each regulatory stage, descending

Permitting (EBL)108
EIA process36
Auction-awarded18
Construction / operation7

Capacity by region

Gigawatts, active pipeline

ProvinceGW
Jeonnam25.64
Ulsan4.21
Incheon3.42
Chungnam3.23
Jeonbuk1.59
Gyeongnam1.09
Busan0.70
Gyeongbuk0.50
Jeju0.28
Gyeonggi0.20
Total pipeline40.8

EBL site locations

Interactive map of licensed sites

108 EBL sites

Foundation type split

Gigawatts by technology

40.8GW total
Fixed-bottom33.0681.0%
Floating5.1012.5%
Cluster zones2.686.6%

Auction outlook

Gigawatts awarded and expected, by year

1.793.810.101.430.830.695.602.192.812022202320242025202620272028
Awarded
Expected / pending

Developers & gencos

Lead developers

Gigawatts led ยท private ownership ยท fixed vs floating

CIP4.02 ยท 8
KREDO2.39 ยท 6
Ocean Winds2.25 ยท 5
SK E&S2.02 ยท 6
Hanwha1.98 ยท 5
Northland Power1.83 ยท 5
ร˜rsted1.40 ยท 2
MyungwoonยทB.Grimm1.15 ยท 2
Hexicon0.75 ยท 2
Daehan Green0.65 ยท 4
Fixed-bottom Floating

Province-designated cluster zones: 3.03 GW across 7 sites (developer not yet assigned).

Genco equity participation

Gigawatts held via equity stake ยท a project may span several gencos

KOMIPO3.33 ยท 10
KOSPO3.01 ยท 11
KOEN2.94 ยท 7
KOWEPO2.83 ยท 8
KHNP1.33 ยท 2
EWP1.11 ยท 3
KEPCO0.64 ยท 4

Gencos take minority equity rather than 100% ownership, so figures overlap with the developer projects on the left; combined genco pipeline โ‰ˆ 15 GW.

Active pipeline only โ€” merged/duplicate records and withdrawn/returned/failed projects excluded.

Developer capacity attributed to lead developer, not equity-weighted.

EEZ projects folded into their coastal province.