South Korea's Ministry of Oceans and Fisheries announced on December 20 that the revised 4th National Port Master Plan (2026-2030) includes construction of a dedicated offshore wind terminal and logis
ACE E&T, a Korean floating offshore wind specialist, is preparing Korea's first offshore field demonstration of a nozzle-injection hydraulic mooring load reduction device and digital twin technology f
South Korea's government is undertaking reforms to offshore wind power purchase agreements (PPA) and fixed-price contracts as part of its H2 2026 energy policy agenda. The initiative aims to improve t
Gochangnoeul Renewable Energy (GCR) and digital transformation specialist 3JCNS signed an MOU to jointly develop and apply digital technologies across renewable energy projects, including offshore win
GS Entec, Korea's leading offshore wind substructure manufacturer, has completed installation of an automated large-scale plate rolling line in partnership with Italian machinery maker Davi. The facil
Three companies—KLEM, OWC, and OEG Renewables—signed an MOU on July 16 to jointly develop a Korean-standard operations and maintenance (O&M) service system for balance-of-plant (BOP) equipment in offs
South Korea's government officially launched construction of the Sinan-Ui 390MW offshore wind farm, the nation's first large-scale project funded entirely with domestic capital. The project, selected
Democratic Party lawmaker Song Ok-ju has introduced an amendment to the Maritime Traffic Safety Act to strengthen safety management for offshore wind farms. The legislative proposal aims to establish
South Korea's flagship Shinan Uido offshore wind project (390 MW, 1.3 trillion won in policy funding) encounters seabed foundation problems and unresolved military radar coordination ahead of its July
Korea's offshore wind sector is breaking through a multi-year construction bottleneck in 2026, with three major projects—Sinan-Ui (390MW), Nakwol (364.8MW), and Hallim (100MW)—now in active constructi
South Korea's government will reform management evaluation and preliminary feasibility study systems to support state power companies' offshore wind expansion. The agreement, reached after 11 months o
A Jeju Provincial Assembly member raised concerns about the Chuza offshore wind project's connection to Jeonnam-Gwangju, emphasizing the need for careful consideration in light of Korea's 2035 carbon