Skip to content

Hanlim Offshore Wind Project Transforms Jeju's Renewable Energy Future

The article profiles Hanlim offshore wind project as a key renewable energy initiative for Jeju Island's energy transition. The project represents a significant step in developing Korea's offshore win

Share:
Hanlim Offshore Wind Project Transforms Jeju's Renewable Energy Future
Published:

Original Korean article: Hanrailbo

The Hallim offshore wind power project is being introduced as a key initiative that will transform Jeju Island's renewable energy future. This project plays an important role in Korea's offshore wind development and in achieving Jeju Island's eco-friendly energy goals.

Article image
Photo: Hanrailbo

KWI developer profile — Korea Electric Power Corporation

6 projects in Korea totalling 500+ MW. Compiled from the KWI database. Not part of the source article.

Hanlim Offshore Wind — this article

Capacity100 MW
LocationJeju
DeveloperKEPCO · KOMIPO · Hyundai E&C · Doosan
StatusIn Operation
LicenceElectricity Business Licence 2019

Southwest Offshore Wind Phase 2

Capacity400 MW
LocationBuan, Jeonbuk
DeveloperKEPCO · 6 Gencos
StatusBid Awarded in 2025
LicenceElectricity Business Licence 2021
EIAmain-phase consultation completed (ME2021C006)

Jeonnam 11 OWIZ (KEPCO) Offshore Wind

LocationJeonnam
DeveloperKorea Electric Power Corporation (KEPCO)
StatusPre-EBL

Jeonnam 4 OWIZ (KEPCO) Offshore Wind

LocationJeonnam
DeveloperKorea Electric Power Corporation (KEPCO)
StatusPre-EBL

Jeonnam 5 OWIZ (KEPCO) Offshore Wind

LocationJeonnam
DeveloperKorea Electric Power Corporation (KEPCO)
StatusPre-EBL

ES-26 Offshore Wind

StatusPre-EBL

Project data: KWI database — Electricity Business Licence records, EIA filings (ME2021C006), Electricity Regulatory Commission minutes, and pre-EBL permit filings.

Found this useful?

Share this article with your network.

More in Daily News

See all