The Ministry of Climate, Energy and Environment announced measures on September 29 to accommodate 100 GW of renewable energy by 2030, including the use of ESS as a non-wires alternative.

Share:
Opinion: ESS should be treated as core national power grid infrastructure
Published:

ESS and grid capacity

Twelve years have passed since Korea Electric Power Corporation began South Korea’s first large-scale frequency-regulation energy storage system (ESS) construction project in 2014. At the time, ESS attracted attention as a new technology that stored electricity for use when needed and as equipment that supplemented generators’ frequency-regulation functions. Today, however, its role is changing substantially.

Its applications are expanding throughout the power system, from frequency regulation and balancing electricity supply and demand to easing transmission congestion, increasing substation hosting capacity and supporting renewable energy grid connections. Frequency-regulation ESS installations began with 52 MW in 2014, followed by 184 MW in 2015 and 140 MW in 2016, securing a total of 376 MW now in commercial operation. The ESS central contract market also selected developers for a total of 1,196 MW from 2023 through the first half of 2026. A further 1,180 MW was put out to tender in the second half of 2026, and developer selection is currently underway.

Found this useful?

Share this article with your network.